• iso-9001-2023.jpg
    https://dab-group.co.uk/images/ju_cached_images/iso-9001-2023_cc45a5e35527c32ca57b4bffabfda0a4_90x50.resized.jpg
  • construction-line.jpg
    https://dab-group.co.uk/images/ju_cached_images/construction-line_8d90f8f1f3d8fd4ccb9da63b24e04e8e_90x50.resized.jpg
  • leia.jpg
    https://dab-group.co.uk/images/ju_cached_images/leia_9611baa0a404738ed16d2b2a44e1b787_90x50.resized.jpg
  • cscs.jpg
    https://dab-group.co.uk/images/ju_cached_images/cscs_849c4d70a21e194b125e9d1b224b2ed8_90x50.resized.jpg
  • sssts.jpg
    https://dab-group.co.uk/images/ju_cached_images/sssts_e902cfd42b55678968de48d398d01f92_90x50.resized.jpg
  • smsts.jpg
    https://dab-group.co.uk/images/ju_cached_images/smsts_3532cc7993684e76195de577396ab187_90x50.resized.jpg
  • iosh.jpg
    https://dab-group.co.uk/images/ju_cached_images/iosh_1732409e9b60adb89d2596346c999950_90x50.resized.jpg

refurbished

Smoke Vent Doors

These must be maintained by law as a statutory test you as the responsible person will be liable if anything should happen.

These are located normally along the corridors to the apartments. They will look like a normal door but have no lock or handle.

These are activated by a smoke detector normally located adjacent to the fire door, when activated the door should open via a ram located to the inside of the door in the smoke duct.

Only the door on the floor that has been activated should open to allow for the smoke to escape through the smoke vent at the top of the building. If another door opens on another floor this will cause the smoke to be deposited and hamper the evacuation.  

Under no circumstances should more than one door be open in the building unless they have been activated by the detectors. 

We recommend a minimum of 4 visits a year on a quarterly basis covering 100% of the system over the visits.

Contact Us

Please fill in all required fields.
captcha
Reload

Head Office

Tel: 01708 553373
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Unit 12 Easter Park
Ferry Lane
Rainham
Essex RM13 9BP

Regional Office

Tel:  0845 272 6810
Fax: 0845 272 6811

252-262 Quayside Tower
2nd Floor Broad Street
Birmingham
B1 2HF

Testimonials

"Please pass on my thanks to the repair team for providing a first class, friendly and professional service"

Andrew Langton, Facilities Manager